In this project, we had to design three types of floating equipment formations using Baars-type modular pontoon elements. The main floating equipment was a pontoon platform designed to accommodate a 71-ton piling machine, which, after piling work was completed, could be dismantled into two independently operating floating equipments capable of accommodating hydraulic excavators.
Main characteristics
- Type: Floating equipment
- Operating zone: Inland waters, 2nd zone
Main dimensions
- Piling Floating equipment:
- Length: 24,4 m
- Beam: 15 m
- Displacement: 309 t
- Floating equipment 1:
- Length: 12,7 m
- Beam: 12,2 m
- Displacement: 125,3 t
- Floating equipment 2:
- Length: 12,7 m
- Beam: 12,2 m
- Displacement: 141,7 t
Construction design
Welded steel structure
Main tasks completed
- Conceptual planning and optimization of the modular pontoon arrangement
- Optimizing the floating equipment for various operating conditions
- Stability booklet
- Longitudinal strength calculation
- Approval documentation
Project participants
- Fair Hydro kft.