Project introduction
During this project, the goal was to create a floating equipment that can perform piling work even in narrow working areas, keeping in mind the cost optimization of the project.
Main characteristics
- Type: Floating equipment
- Operating zone: Inland waters, 2nd zone
Main dimensions
- Length: 12,6 m
- Beam: 9,75 m
- Displacement: 112,1 t
Construction design
Welded steel structure
Main tasks completed
- Conceptual planning and optimization of the modular pontoon arrangement
- Optimizing the floating equipment for various operating conditions
- Stability booklet
- Longitudinal strength calculation
- Approval documentation
Project participants
- FairHydro kft.